Total quality management

Previzualizare licența:

Cuprins licența:

1 PRESENTATION OF THE COMPANY
1.1 MODALITIES OF PAYMENT
1.2 BALANCE SHEET AND P&L STATEMENTS
1.3 FINANCIAL SITUATION AT THE BEGINING OF THE YEAR
2 DESIGNING FOR CUSTOMERS NEED
2.1 DESIGN: A CORE BUSINESS RESPONSABILITY
2.2 RESEARCH, DESIGN AND DEVELOPMENT STRATEGY
2.3 DESIGN OBJECTIVES
2.4 DESIGN REVIEW AND APPRAISAL
2.5 THE QUALITY IMPERATIVE
2.5.1 QUALITY: A BROAD VIEW
2.5.2 TQM: HISTORY AND HERITAGE
2.5.3 TQM AND COMPETITIVENESS
2.5.4 RECOGNIZING QUALITY
2.5.5 EMPLOYEE - DRIVEN QUALITY
2.6 PROCESS CONTROL AND IMPROVEMENT
2.6.1 IMPROVING OUTPUTS AND PROCESSES
2.6.2 THE PROCESS FOCUS
2.6.3 COARSE - GRAINED ANALYSIS AND IMPROVEMENT
2.6.4 FINE - GRAINED ANALYSIS AND IMPROVEMENT
2.7 FLOW CONTROL: ELIMINATING PROCESS WASTE
2.7.1 FLOW - CONTROL SYSTEM OVERVIEW
2.7.2 QUICK - CHANGE FLEXIBILITY
2.7.3 QUICK RESPONSE
2.7.4 INVENTORY CONTROL AND TURNOVER
2.8 TIMING - ANOTHER IMPERATIVE
2.8.1 TIMING - IMPACT ON OM
2.8.2 PULL AND PUSH MODE OPERATIONS
3 CONCLUSIONS
4 BIBLIOGRAPHY

Extras din licența:

In the year 1991, when was concluded, IMPACT SA company was dealing with renting of own real estates, but beginning with the year 1995 the company s activity concentrates mostly on the construction of houses situated in the firm s own residential ensembles.

The initial launching of the company on the real estate market began with the first residential project Alfa Ensemble, which contains 40 houses and which was finalized in September 2001. In the first ensemble, IMPACT built only luxury villas.

The succsessful ending of this first real estate project brought recognition to the company in the world of real estate promoters which operate on the Bucharest market.

Starting a project with own forces and with the aid of a long term bank credit (payable within 15 months) contracted in 1995, IMPACT succeeded to prove the viability and the success of a well thoughted business.

In 1998, IMPACT started a second project the Beta Ensemble with a number of 70 houses: luxury villas and a new product accesible villas.

With this project the company began indeed the actual diversification of the products, adapting itself to the demand of the market and offering to a large number of persons the possibility to build their own home.

The Gamma Ensemble was the third ensemble started in 1999 and the Delta ensemble was started in 2000. Together, these ensembles contain over 300 houses, diffrent as architectonic style and prices: luxury villas, accessible villas and others and in September 2001 in Delta ensemble began the construction of the first timber made house.

In July 2001 began the construction of Epsilon ensembly, which will comprise an office building of the company, excepting the 56 houses mostly luxury and accessible villas.

Year 2002 began with the expanding of the company s activity through the construction of their own commercial centre with materials and construction systems DePact. The main activities of the centre is warehousing and commercialization of the materials and construction systems. A big part of the materials are realized by subdivisions of the DePact: SitPact, LePact, MePact and FerPact.

The services offered by the IMPACT are construction consultancy, finan cial consultancy and real estate consultancy; also the firm offers a great experience in the domain of construction of holls and deposits, construction of offices and commercial centers.

The company has a team of 30 projection specialists formed by architects, resistance engineers, plumbing engineers, system engineers and project managers with a lot of experience accumulated in the domain of house and residential ensembles construction.

Also the clients of the company benefits by the performant working tools, projection programs, informatic systems and typical studs.

The work in the building site is supervised by a team with an important experience in supervising the construction of houses. As for the quality, IMPACT guarantees for its work.

In the domain of interior and ...

Descarcă licența

Pentru a descărca acest document,
trebuie să te autentifici in contul tău.

Structură de fișiere:
  • Total quality management
    • Anexe
      • Anexa.doc
    • Cuprins.doc
    • Diploma.doc
Alte informații:
Tipuri fișiere:
doc
Diacritice:
Nu
Nota:
8/10 (3 voturi)
Anul redactarii:
2003
Nr fișiere:
3 fisiere
Pagini (total):
72 pagini
Imagini extrase:
105 imagini
Nr cuvinte:
22 219 cuvinte
Nr caractere:
129 574 caractere
Marime:
98.75KB (arhivat)
Publicat de:
Anonymous A.
Nivel studiu:
Facultate
Tip document:
Licența
Domeniu:
Limbi Străine
Predat:
la facultate din Bucuresti
Specializare:
-
Materie:
Limbi Străine
Sus!